New supervent chimney installed and restored the wood stove.
The little stove heats the basment well to keep the temperature around 70 F.
Monday, November 3, 2008
Wednesday, October 1, 2008
New 20 x 18 Deck
A few more square feet of decking ( 20' x 18' ). This is mostly for the 10' x 10' gazebo. The railing and stairs still have to be added, hopefully this will happen before winter.
Entirely built by Jenn.
New Deck ( Sealed ) & Old Deck washed and sealed
Entirely built by Jenn.
New Deck ( Sealed ) & Old Deck washed and sealed
Tuesday, September 16, 2008
Well water testing !
We finally ended up testing our well water after 3 years. Due to a non existing well seal, all the run off from the spring and summer contaminated our well water. Bacterial count was still very low but it had to be addressed.
$350 for well seal and brass elbows and clorination.
We are going to test water on monthly basis.
$350 for well seal and brass elbows and clorination.
We are going to test water on monthly basis.
Wood Stove clearances to framing/insulation
This was a little tricky to accomplish with the septic discharge line being right above it but we managed. 2" clearance around the stainless steel chimney. 2" clearance between chimey and bulkhead. 12" clearance under the chimney outside to be able to access the cleanout.
Images
Images
Tuesday, March 4, 2008
Energy Efficient Windows
Shopping around for 5 Energy efficient windows for the basement. 3 out of the five windows are single pane glass windows, 2 are double pane. Measurements are 3x (40" x 24"), 2x ( 40" x 28").
Friday, February 15, 2008
Seal every nook and crany
Sealing up all rim joists, seal plate, electrical panel and old dryer vents in the basement. 15 cans should seal all airleaks in the basement.I found that these area's are the most subseptible areas for airleaks in our house.
Electrical Panel was drafty with three 2" holes in the cinderblocks. Also placed 1" rigid foam behind the panel and spray foamed all edges.Discovered a few more airleaks between the silplate and foundation, top / bottom of each rim joist which have to be sealed.

I also ended up replacing the cement patch around the double walled chimney. Packed the holes with cinderblock/brick pieces and re-cemented. Disconnected the stove & stovepipe.
Monday, February 11, 2008
Wood Stove in the basement
Doing a little research on how to safely enclose 10" insulated chimney. After a few trips to Home Depot and Home Hardware I am no further ahead.
The ULC rated chimney pipe label clearly states that a non combustible material must have a min of 2" of clearance from the chimney.
I have found a few good suggestions by posting on Hearth forums.
Wood stove is going to be angled on 45 against the west wall and the bathroom wall.

Shopping around for masonry product to cover the hearth pad and wall surface for the stove.
The ULC rated chimney pipe label clearly states that a non combustible material must have a min of 2" of clearance from the chimney.
I have found a few good suggestions by posting on Hearth forums.
Wood stove is going to be angled on 45 against the west wall and the bathroom wall.

Shopping around for masonry product to cover the hearth pad and wall surface for the stove.
Thursday, January 24, 2008
Attic insulation
Blown in cellulose ( R50 ) into the attic ( 13" in Family room attic, 13" in Main attic ) in addition to R12 fibreglass bats. Total of 87 bags used by the installer to complete both attics. We re-routed & installed new roof vent for bathroom fan.
Images ( before & after ) insulation was completed.
Cellulose VS Fibreglass
Deciding the best insulation for your home.
Tuesday, January 22, 2008
Energy Efficiency Evaluation Report
Finally received our EnerGuide ration. Our score was not far off from what I expected ( Score 56 ). Score to target is 71, which would allow us to rate in the top 20% of this group of houses considering the age/location of the house.
Top recommendations according to Potential for Energy savings and Incentives.
1. Increase the insulation of the basement walls by a min R10/max of R24 ( full height ). Incentives $463.
2. Increase the insulation value of 100% of the total crawlspace wall surface by a min of R10. Incentives $30
3. Seal all of your basement header are and increase insulation value by a min of R20. Incentives $100
4. Increase insulation value of your attic from the current level of R12 to R50. Incentives $600
5. Replace windows with ENERGY STAR qualified windows. Incentives $390
The incentives on the actual proposed Grant Amounts are a little deceiving to what is shown and what you are actually eligible for.
Top recommendations according to Potential for Energy savings and Incentives.
1. Increase the insulation of the basement walls by a min R10/max of R24 ( full height ). Incentives $463.
2. Increase the insulation value of 100% of the total crawlspace wall surface by a min of R10. Incentives $30
3. Seal all of your basement header are and increase insulation value by a min of R20. Incentives $100
4. Increase insulation value of your attic from the current level of R12 to R50. Incentives $600
5. Replace windows with ENERGY STAR qualified windows. Incentives $390
The incentives on the actual proposed Grant Amounts are a little deceiving to what is shown and what you are actually eligible for.
Friday, January 11, 2008
Crawlspace is complete
91 Square feet of hell. I can not describe in words how glad I am to have this space completed. Materials ( tools not listed) and prices are listed below with a total cost.
Damn this is one expensive crawlspace !!
Tuc tape $10.97
2x4x12 lumber $8.26
2x4x8 lumber $32.04
2x4x16 lumber $10.97
2" R10 XPS $160.79
Spray Foam $10.40
PL300 adhesive $13.16
DeltaFL subfloor $62.99
4x8-5/8" plywood $68.61
Woodscrews $9.03
H-Brackets $4.50
Outdoor Carpet $48.00
Drywall Screws $5.99
Tapcon Screws $11.49
Total Cost $457.20 w/o Tax
Reused Materials ( R12 Fibreglass batts ) & Drywall.
Wow $457.20 + tax = $516.63.
$5.67/sqf
Images of Crawlspace
Damn this is one expensive crawlspace !!
Tuc tape $10.97
2x4x12 lumber $8.26
2x4x8 lumber $32.04
2x4x16 lumber $10.97
2" R10 XPS $160.79
Spray Foam $10.40
PL300 adhesive $13.16
DeltaFL subfloor $62.99
4x8-5/8" plywood $68.61
Woodscrews $9.03
H-Brackets $4.50
Outdoor Carpet $48.00
Drywall Screws $5.99
Tapcon Screws $11.49
Total Cost $457.20 w/o Tax
Reused Materials ( R12 Fibreglass batts ) & Drywall.
Wow $457.20 + tax = $516.63.
$5.67/sqf
Images of Crawlspace
Wednesday, January 9, 2008
Sawdust
After spending 2 hours in the emergency room ( 50 min in waiting room, 25 min eye flush, 45 min examination) and getting my upper eyelid flipped and cleaned I learned a valuable lesson.
WEAR EYE PROTECTION.
WEAR EYE PROTECTION.